The 1600-meter section of the Buca – Üçyol Metro Project has been completed
Within the scope of Buca – Üçyol Metro Project, our 2 TBM machines that entered from Buca Koop construction site have successfully completed the approximately 1600-meter section between Buca Koop Station and Dokuz Eylül Station. Within the scope of our project, 2 more TBM Machines continue their work between General Asım Gündüz Station and Hatbaş Shaft (approximately 2100 meters)