Location: İstanbul,Turkey
Client: Istanbul Metropolitan Municipality
- 17.5 km Double Line Metro
- 13 Underground & 2 Aboveground Metro Station
- Design & Civil & Structural Works
- Elevated Metro Line

Location: İstanbul,Turkey
Client: İstanbul Metropolitan Municipality
- 21.5 km Double Line Metro
- 14 Underground & 1 Elevated Metro Stations
- Elevated Metro Line
- Design, Civil & Structural Works and
- Architectural Works
- Track Works
- Signalling and E & M Works
- Supply of 34 Numbers of Rolling Stock

Location: İstanbul, Turkey
Client: İstanbul Metropolitan Municipality
- 26.3 km Double Line Metro
- 16 Underground & 1 Elevated Metro Stations
- Design, Civil & Structural Works and Architectural Works
- Track Works
- Signalling and E&M Works

Location: Warsaw, Poland
Client: Warsaw Municipality
- 6.5 km Double Line Metro
- 7 Underground Metro Stations
- Design, Civil & Structural Works and Architectural Works
- Track Works
- Signalling and E & M Works

Location: İstanbul, Turkey
Client: İstanbul Metropolitan Municipality
- Total Length: 947m
- 360m Stay Cable Bridge
- 120m Swing Bridge
- 413m Viaduct ( 2 pieces )
- Civil & Structural Works
- E & M Works
- Bridge Over Station Structure
- Login Structure ( 2 pieces )

Location: İstanbul, Turkey
Client: İstanbul Metropolitan Municipality
- Ataturk Airport – Yenibosna Connection Line
- Design, Civil & Structural Works, Architectural Works
- Tunnelling Works
- Elevated Metro Line
- Trackworks
- Signalling - E & M Works

Location: Eskişehir, Turkey
Client: Eskişehir Metropolitan Municipality
- 24.7 km Double Line Tramline
- 51 Stops
- Design, Civil & Structural Works, Architectural Works
- Track Works
- Signalling – E & M Works

Location: Ankara, Turkey
Client: Ministry of Transport, Maritime Affairs and Communications
- 9.2 km Double Line Metro
- 9 Underground Station
- Design & Civil & Architectural Works Track Works

Location: Ankara, Turkey
Client: General Directorate of Turkish State Railways (TCDD)
- Within 290.000 m² , 46.000 m² High Speed Train Depot & Maintenance Complex
- SCADA Control and Communication Systems
- Power Supply & Catenary
- Signalling
- Equipment Supply
- 33 Railway Line
- 32 km Trackworks
- Steel Structure Works

Location: Konya, Turkey
Client: General Directorate of Turkish State Railways (TCDD)
- 106 km Double Line High Speed Railway
- 215 km Trackworks
- Infrastructure Works
- Superstructure Works
- Railway Bridge

Location: Eskişehir, Turkey
Client: General Directorate of Turkish State Railways (TCDD)
- 25.7 km High Speed Railway Line Superstructure & Electrification Works
- Track Works
- Catenary System & Power Supply
- Viaduct


Location: İstanbul,Turkey
Client: Sonkar Otomotive
- Turkey’s Tallest Steel Building Double Tree Hilton İstanbul
- 32 Storey ( 29 Storey Steel , 3 Storey Conrete )


Location: Konya, Turkey
Client: Konya Şeker Sanayi ve Ticaret A.Ş
- 12.000 ton/day Capacity Sugar Factory

Location: Aksaray, Turkey
Client: MB Şeker Sanayi ve Ticaret A.Ş
- 6.000 ton/day Capacity Sugar Factory


Location: Mersin, Turkey
Client: Türkiye Şişe ve Cam Fabrikaları A.Ş.
- 200.000 m2 Indoor Area, 400.000 m2 Outdoor Area Glass Factory

Location: Ankara, Turkey
Client: Cockerill Mechanical Industries (CMI), Belgium
- 770 MW NGCC Power Plant


Location: Dubai, UAE
Client: RTA
- 15 km Double Line Metro
- 2 Underground & 5 Elevated Metro Stations
- Design, Civil & Structural Works and Architectural Works
- Track Works
- Signalling and E & M Works
- Supply of Expo 2020 Rolling Stoc

Location: Warsaw, Poland
Client: Warsaw Municipality
- 2.5 km Double Line Metro
- 3 Underground Metro Stations
- Design, Civil & Structural Works and Architectural Works
- Track Works
- Signalling and E & M Works

Location: Gaziantep, Turkey
Client: General Directorate of Turkish state Railways (TCDD)
- 25 km Railway Line
- 17 Stations
- Infrastructure Works, Superstructure Works
- Railway Electrification, Signaling and Telecom Works

Location: İzmir, Turkey
Client: İzmir Metropolitan Municipality
- 22.3 km Double Line Tramline
- 34 Stops
- Design, Civil & Structural Works, Architectural Works
- Track Works
- Signalling – E & M Works
- Tramway Depot
- Supply of 38 Numbers of Rolling Stock

Location: Kocaeli, Turkey
Client: Kocaeli Metropolitan Municipality
- 10.7 km Double Line Tramline
- 11 Stops
- Design, Civil & Structural Works, Architectural Works
- Track Works
- Signalling – E & M Works

Location: Samsun, Turkey
Client: Ministry of Transport, Maritime Affairs and Communication
- Reconstruction of 378 km Railway
- Infrastructure Works
- Superstructure Works
- Tunnel & Bridge Workds
- Railway Electrification
- Signalling & Telecom Works

Location: Warsaw, Poland
Client: General Directorate of National Roads and Motorways
- 6.5 km Expressway
- 1.5 km Bridge (over Vistula River)

Location: İstanbul, Turkey
Client: Ministry of Transport,Maritime Affairs and Communication
- 7.4 km Double Line Metro
- 4 Underground Metro Station
- Design, Civil & Structural Works and Architectural Works
- Track Works
- Signalling and E & M Works

Location: Pune, India
Client: Maharashtra Metro Rail Corporation Limited (Maha-Metro)
- 2 Underground Stations
- TBM Tunnel 4.28 km, NATM Tunnel 155 m
- Ramp 363 m, 423 m Cut and Cover
- Structural Works
- Architectural Works
- Electromechanical Works
- BIM Modeling
- 2 Cable Stayed Bridges
- 1 Elevated Station

Location: İzmir, Turkey
Client: İzmir Metropolitan Municipality
- 7,2 km Double Line Metro
- 7 Underground Metro Station
- Design, Civil & Structural Works and Architectural Works
- Track Works, Signalling and E&M Works

Location: Świnoujście, Poland
Client: -
- 12,5 km of Dual Carriage Expressway
- Three Tunnels of Lengths About 117 m, 870 m, and 661 m
- 27 Bridge
- 4 km of Retaining Walls
- Three Road İnterchanges and Extension of One Road İnterchange

Location: Poznan, Poland
Client: -
- 3,3 km of Tram Line
- 7,5 km of Road Works
- 8 Tram Stops
- Viaduct

Location: Kayseri, Turkey
Client: -
- 5.5 km Double Tramline
- 9 Stops
- Design
- Power Supply, Signaling, Telecommunication Works
- Civil & Structural Works
- Track Works

Location: Pune, India
Client: Maharashtra Metro Rail Corporation Limited (Maha-Metro)
- 3 Underground Stations viz. Budhwar Peth, Mandai and Swargate
- TBM Tunnel 4.062 km (upline and downline), NATM Tunnel 755 m
- Structural works
- Architectural works
- Electromechanical works
- BIM Modeling
- 2 Elevated Stations